Civic & community construction · 2024–2025
Merivale Community Centre
A complete structural steel package for Tauranga's new purpose-built community hub—from shop drawings and fabrication through coatings, delivery and onsite erection.
01
Project scope
Responsibility carried through the steel package.
Morgan Steel held the structural steel subcontract under Marra Construction, manufacturing, supplying and installing the steel package to the structural engineer's documentation. The work carried through the primary frame, secondary roof steel, bracing, fixings, coatings and site installation.
Structural steel shop drawingsComplete structural frameHold-down bolt cagesProtective coating systemsNDE weld inspectionStructural bolts and concrete fixingsReid bracing and purlin installationCartage and Hiab installation








02
What this demonstrates
Complete structural packagePublic community facilityFrame, purlins and bracingDocumented CC3 delivery
Similar project
Bring Morgan in
early.
Drawings do not need to be final. Send what you have—or tell us what is coming—and we can discuss timing, scope and current availability.
Contact us- Contact
- Office07 927 7260Mobile021 889 734Karlkarl@morgansteel.co.nzBenben@morgansteel.co.nz
- Workshop hours
- Monday–Thursday7:30 am–4:30 pmFriday7:30 am–11:30 am