Aerial view of the modular classroom buildings under construction at Rangitāiki College
Modular & Repeat Fabrication

Modular education · 2025–2026

Rangitāiki College Modular Classrooms

Structural steel frame packages for four modular classroom buildings—three six-bay buildings and one five-bay building—fabricated and coated for ModCom.

LocationRangitāiki College, Bay of PlentyMorgan’s clientModComAsset ownerRangitāiki CollegeDeliveryFabrication · Coatings · Delivery

Responsibility carried through the steel package.

Working to ModCom's modular structural system under Marra Construction's main contract, Morgan Steel produced the repeat steel frame packages for four classroom buildings. The steel was fabricated and coated in Tauranga, then delivered to ModCom's Tauriko facility for the next stage of modular production.

Structural steel shop drawingsThree six-bay classroom framesOne five-bay classroom framePFC base-frame fabricationPFC portal columns and raftersSIP panel support anglesStructural plates, connections and galvanised boltsInternal and external protective coating systemsDelivery to ModCom's Tauriko facility

Repeat fabrication

Every connection has to land again.

A modular frame is not successful because the first unit fits. Base frames, portals, support angles and connection plates must remain consistent across the production run so each wall, floor and roof assembly can move cleanly into the next stage. Rangitāiki demonstrates that repeat discipline across 23 structural bays.

Four classroom buildings23 structural baysRepeat portal-frame systemFabrication through coatings

Similar project

Bring Morgan in
early.

Drawings do not need to be final. Send what you have—or tell us what is coming—and we can discuss timing, scope and current availability.

Contact us
Visit
8 Tangmere Place
Greerton, Tauranga 3112
Contact
Office07 927 7260Mobile021 889 734Karlkarl@morgansteel.co.nzBenben@morgansteel.co.nz
Workshop hours
Monday–Thursday7:30 am–4:30 pmFriday7:30 am–11:30 am