Civic seismic strengthening · 2024–2025
Toi Tauranga Art Gallery
A complete seismic structural-steel package integrated through an existing civic building, together with new structural steel for the gallery's café extension.
Project scope
Responsibility carried through the steel package.
Morgan Steel was engaged in 2024 for site measurement and preconstruction work, then fabricated, supplied and installed the strengthening steel onsite in 2025. The package extended from the base connections through the upper structure and included the new café framing.







Existing-building discipline
Measured against the building—not assumptions.
Morgan Steel's involvement began with site measurement and verification in 2024. That early work established the real interfaces before fabrication, helping the strengthening steel and new café structure fit the building uncovered onsite.
What this demonstrates
Similar project
Bring Morgan in
early.
Drawings do not need to be final. Send what you have—or tell us what is coming—and we can discuss timing, scope and current availability.
Contact us- Contact
- Office07 927 7260Mobile021 889 734Karlkarl@morgansteel.co.nzBenben@morgansteel.co.nz
- Workshop hours
- Monday–Thursday7:30 am–4:30 pmFriday7:30 am–11:30 am