Hydroelectric infrastructure · 2020
Tuai Power Station Upgrade
A comprehensive structural steel package for generator and excitation upgrade works inside an existing hydroelectric power station.
Project scope
Responsibility carried through the steel package.
Working under contract to Conspec from AECOM engineering documentation, Morgan Steel fabricated, supplied and installed multiple structural and access-steel packages integrated into the existing generating facility.
Supply and install
Canopy installation at Tuai Power Station
Morgan Steel installing the prefabricated canopy by crane. The original site footage has been accelerated for this short project sequence.







What this demonstrates
Relevant experience
Proven infrastructure disciplines for the next generation of data centres.
This completed project is part of the evidence behind Morgan Steel’s readiness for structural and secondary steel packages around data-centre power, plant, access and modular systems.
See the data-centre capabilitySimilar project
Bring Morgan in
early.
Drawings do not need to be final. Send what you have—or tell us what is coming—and we can discuss timing, scope and current availability.
Contact us- Contact
- Office07 927 7260Mobile021 889 734Karlkarl@morgansteel.co.nzBenben@morgansteel.co.nz
- Workshop hours
- Monday–Thursday7:30 am–4:30 pmFriday7:30 am–11:30 am